How your house gets built,in ten simple steps.

Building a house is a big decision, so here is the whole journey in plain words: what happens at each step, what you receive, what we need from you, and roughly how long it takes.

  1. Steps 1 to 3Plan it

    Contact us, we visit your plot, and you see a first plan with a rough cost.

  2. Steps 4 to 6Design and agree

    Full design, a detailed price list, and a written agreement with stage-wise payments.

  3. Steps 7 to 10Approve and build

    Building approval, construction, finishing, and handover with the keys.

Our promises to you

  • Free site visitand first consultation, with no obligation.
  • Itemised quotewith brands. No hidden costs. Any change is priced and approved by you in writing first.
  • Pay by stageYou pay for each stage only after it is done and checked.
  • Weekly photosProgress photos and updates on WhatsApp every week.
  • Architects on siteRegistered architects on our team check every stage.
  • Written agreementwith specifications, timeline and payment schedule.
  • Free check-up visitwithin 6 months of handover, to fix anything small.
  1. 01

    Contact us

    Message us on WhatsApp, call, or fill in the form. We reply the same day and ask four simple things: where the plot is, how big it is, roughly what you want to spend, and when you would like to start.

    You get
    A call back and a time for the site visit
    You do
    Share the plot location and a rough idea of what you want
    Time
    We reply the same day
  2. 02

    We visit your plot (free)

    We visit the plot, check access, levels, drainage and neighbouring buildings, and sit with your family to understand how you live: rooms, parking, rental floors, pooja room, elders, future plans.

    You get
    Honest advice on what the plot allows and a written brief
    You do
    Keep the plot documents ready (list below)
    Time
    Within a few days of your call
  3. 03

    First plan and rough cost

    We draw a first layout for your plot and give a rough cost, so you know early whether the plan and your budget match. You decide whether to go ahead.

    You get
    A concept plan and an approximate cost
    You do
    Tell us what you like and what to change
    Time
    About 1 to 2 weeks
  4. 04

    Design your house

    Our architects develop the floor plans and the 3D elevation with you, then the structural, electrical and plumbing drawings. Changes are cheapest on paper, so we take the time to get it right here.

    You get
    Floor plans, 3D elevation, working drawings
    You do
    Review and approve each drawing
    Time
    About 3 to 6 weeks, depending on revisions
  5. 05

    Detailed price list (the quote)

    A written list of every item of work, every material and brand, and the finish for each room, with the price. It says clearly whether GST is included.

    You get
    An itemised quote and a specification sheet
    You do
    Choose brands and finishes; ask anything
    Time
    About 1 week after the design is fixed
  6. 06

    Sign the agreement

    A written agreement that lists what will be built, the timeline, and a payment schedule linked to the stages of work, so every payment matches work you can see.

    You get
    A signed agreement and the stage-wise schedule
    You do
    Sign and pay the first stage
    Time
    One meeting
  7. 07

    Building approval

    We prepare the drawings and documents that the building approval needs (CMDA, DTCP or the local body, depending on where the plot is) and guide you through the process.

    You get
    Approval drawings and help at every step
    You do
    Sign the forms and pay the government fees
    Time
    Depends on the authority; we tell you upfront
  8. 08

    Construction, stage by stage

    Foundation, plinth, columns, each slab, brickwork, plastering. Our architects check each stage before it is closed, and you receive photos and a progress update on WhatsApp every week. You are welcome on site any time.

    You get
    Weekly photos; a stage check before each payment
    You do
    Visit when you like; pay each stage once it is done
    Time
    Most houses take several months; your timeline is in the agreement
  9. 09

    Finishing and interiors

    Flooring, painting, doors and windows, electrical and plumbing fittings, and, if you choose, kitchen, wardrobes, ceilings and lighting. You pick from samples before anything is fixed.

    You get
    Samples and a finishing schedule
    You do
    Choose tiles, colours and fittings
    Time
    Part of the agreed timeline
  10. 10

    Handover

    We walk through the house with you and list anything that needs fixing. Everything is fixed before the keys. You receive the drawings, warranty details and simple maintenance tips, and we come back for a check-up after you move in.

    You get
    Keys, drawings, warranty details, a follow-up visit
    You do
    Walk through with us and sign off
    Time
    About a week for the snag list

Before the site visit

Documents to keep ready

Not sure you have them all? That is fine. Bring what you have and we will tell you what is missing.

Get this list on WhatsApp
  • Sale deed (title document)
  • Patta and chitta
  • Encumbrance certificate (EC)
  • Approved layout or plot sketch with measurements
  • Property tax receipt, if any
  • Soil test report, if already done
  • Photos of the plot and the road in front
  • A rough budget and any house photos you like

Payments

You pay as the house rises.

Each payment is tied to a stage in your agreement. The exact stages and amounts are written into your agreement.

  1. BookingAgreement signed
  2. FoundationFootings and plinth
  3. SlabsOne stage per floor
  4. MasonryWalls and plastering
  5. FinishingFloors, paint, fittings
  6. HandoverAfter the snag list