How we work
How your house gets built,in ten simple steps.
Building a house is a big decision, so here is the whole journey in plain words: what happens at each step, what you receive, what we need from you, and roughly how long it takes.
- Steps 1 to 3Plan it
Contact us, we visit your plot, and you see a first plan with a rough cost.
- Steps 4 to 6Design and agree
Full design, a detailed price list, and a written agreement with stage-wise payments.
- Steps 7 to 10Approve and build
Building approval, construction, finishing, and handover with the keys.
Our promises to you
- Free site visitand first consultation, with no obligation.
- Itemised quotewith brands. No hidden costs. Any change is priced and approved by you in writing first.
- Pay by stageYou pay for each stage only after it is done and checked.
- Weekly photosProgress photos and updates on WhatsApp every week.
- Architects on siteRegistered architects on our team check every stage.
- Written agreementwith specifications, timeline and payment schedule.
- Free check-up visitwithin 6 months of handover, to fix anything small.
-
01
Contact us
Message us on WhatsApp, call, or fill in the form. We reply the same day and ask four simple things: where the plot is, how big it is, roughly what you want to spend, and when you would like to start.
- You get
- A call back and a time for the site visit
- You do
- Share the plot location and a rough idea of what you want
- Time
- We reply the same day
-
02
We visit your plot (free)
We visit the plot, check access, levels, drainage and neighbouring buildings, and sit with your family to understand how you live: rooms, parking, rental floors, pooja room, elders, future plans.
- You get
- Honest advice on what the plot allows and a written brief
- You do
- Keep the plot documents ready (list below)
- Time
- Within a few days of your call
-
03
First plan and rough cost
We draw a first layout for your plot and give a rough cost, so you know early whether the plan and your budget match. You decide whether to go ahead.
- You get
- A concept plan and an approximate cost
- You do
- Tell us what you like and what to change
- Time
- About 1 to 2 weeks
-
04
Design your house
Our architects develop the floor plans and the 3D elevation with you, then the structural, electrical and plumbing drawings. Changes are cheapest on paper, so we take the time to get it right here.
- You get
- Floor plans, 3D elevation, working drawings
- You do
- Review and approve each drawing
- Time
- About 3 to 6 weeks, depending on revisions
-
05
Detailed price list (the quote)
A written list of every item of work, every material and brand, and the finish for each room, with the price. It says clearly whether GST is included.
- You get
- An itemised quote and a specification sheet
- You do
- Choose brands and finishes; ask anything
- Time
- About 1 week after the design is fixed
-
06
Sign the agreement
A written agreement that lists what will be built, the timeline, and a payment schedule linked to the stages of work, so every payment matches work you can see.
- You get
- A signed agreement and the stage-wise schedule
- You do
- Sign and pay the first stage
- Time
- One meeting
-
07
Building approval
We prepare the drawings and documents that the building approval needs (CMDA, DTCP or the local body, depending on where the plot is) and guide you through the process.
- You get
- Approval drawings and help at every step
- You do
- Sign the forms and pay the government fees
- Time
- Depends on the authority; we tell you upfront
-
08
Construction, stage by stage
Foundation, plinth, columns, each slab, brickwork, plastering. Our architects check each stage before it is closed, and you receive photos and a progress update on WhatsApp every week. You are welcome on site any time.
- You get
- Weekly photos; a stage check before each payment
- You do
- Visit when you like; pay each stage once it is done
- Time
- Most houses take several months; your timeline is in the agreement
-
09
Finishing and interiors
Flooring, painting, doors and windows, electrical and plumbing fittings, and, if you choose, kitchen, wardrobes, ceilings and lighting. You pick from samples before anything is fixed.
- You get
- Samples and a finishing schedule
- You do
- Choose tiles, colours and fittings
- Time
- Part of the agreed timeline
-
10
Handover
We walk through the house with you and list anything that needs fixing. Everything is fixed before the keys. You receive the drawings, warranty details and simple maintenance tips, and we come back for a check-up after you move in.
- You get
- Keys, drawings, warranty details, a follow-up visit
- You do
- Walk through with us and sign off
- Time
- About a week for the snag list
Before the site visit
Documents to keep ready
Not sure you have them all? That is fine. Bring what you have and we will tell you what is missing.
Get this list on WhatsApp- Sale deed (title document)
- Patta and chitta
- Encumbrance certificate (EC)
- Approved layout or plot sketch with measurements
- Property tax receipt, if any
- Soil test report, if already done
- Photos of the plot and the road in front
- A rough budget and any house photos you like
Payments
You pay as the house rises.
Each payment is tied to a stage in your agreement. The exact stages and amounts are written into your agreement.
- BookingAgreement signed
- FoundationFootings and plinth
- SlabsOne stage per floor
- MasonryWalls and plastering
- FinishingFloors, paint, fittings
- HandoverAfter the snag list